Hastelloy C276 (UNS N10276 / 2.4819) seamless tubes and pipes are widely used in chemical, petrochemical, pollution control, and marine applications because of their exceptional resistance to oxidizing and reducing agents. The price of C276 seamless tube & pipe depends on diameter, wall thickness, length, and order quantity. China has become a major supplier for cost-effective C276 seamless tubes.
Specifications of Hastelloy C276 Seamless Tubes & Pipes
- Grade: Hastelloy C276 (UNS N10276 / 2.4819)
- Standard: ASTM B622, ASME SB622
- Outer Diameter: 6mm – 600mm
- Wall Thickness: 0.5mm – 50mm
- Length: 6 meters standard, custom lengths available
- Surface: Annealed, pickled, polished
China Factory Price Range (USD/kg)
OD (mm) | Wall Thickness | Length | Price (USD/kg) |
---|---|---|---|
6 – 25 | SCH10 / SCH40 | 6 meters | USD 100 – 125 |
25 – 100 | SCH40 / SCH80 | 6 meters | USD 110 – 140 |
100 – 200 | SCH40 / SCH80 | 6 meters | USD 120 – 150 |
200 – 400 | SCH40 / SCH80 | 6 meters | USD 130 – 160 |
400 – 600 | SCH40 / SCH80 | 6 meters | USD 140 – 180 |
Seamless vs Welded Pipes
- Seamless pipe: Higher cost due to extrusion and hot finishing, superior corrosion and pressure performance.
- Welded pipe: Lower price, suitable for larger diameters or low-pressure applications, may require post-weld heat treatment.
Factors Affecting Price
- Nickel and molybdenum market prices
- Pipe diameter and wall thickness
- Certification and testing requirements (NACE MR0175, PED)
- Quantity ordered
- Surface finish and special processing
Applications of Hastelloy C276 Seamless Tubes
- Chemical reactor lines and scrubbers
- Pollution control equipment for flue gas desulfurization
- Marine engineering and seawater piping
- Heat exchangers handling corrosive media
- Pulp and paper industry processing lines
FAQ
Q1: Can C276 seamless tubes be supplied in custom lengths?
Yes, factories can cut tubes to requested lengths and provide specific OD/WT combinations.
Q2: Are Mill Test Certificates provided?
Yes, EN 10204 3.1 or 3.2 certificates are available for all Chinese C276 tube shipments.
Q3: What is the lead time for large orders?
Typically 4–8 weeks depending on size, quantity, and surface finish requirements.